Page 25 - The DILG R1 in 2016
P. 25

BuB 2015

                CITY/                                      ALLOCATION    OBLIGATION     TOTAL
            MUNICIPALITY    PROJECT TITLE                                             RELEASES       STATUS
                                                       Ilocos Norte
          Badoc             Flood control                 1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Badoc             Rescue equipment              500,000.00     500,000.00    500,000.00   Completed
          Badoc             Potable Water Supply          2,400,000.00    2,400,000.00    2,395,908.10   Completed
          Bangui            Potable Water Supply          3,500,000.00    3,500,000.00    2,800,000.00   On-going (80%)
          Banna             Evacuation center             500,000.00     500,000.00    500,000.00   Completed
          Banna             Flood control                 3,000,000.00    3,000,000.00    2,982,629.99   Completed
          Banna             Potable Water Supply          500,000.00     500,000.00    500,000.00   Completed
          Batac City        Rescue equipment              500,000.00     500,000.00    500,000.00   Completed
          Batac City        Potable Water Supply          500,000.00     500,000.00    500,000.00   Completed
          Batac City        Potable Water Supply          700,000.00     700,000.00    700,000.00   Completed
          Batac City        Potable Water Supply          500,000.00     500,000.00    500,000.00   Completed
          Carasi            Potable Water Supply          2,379,285.89    2,379,285.89    1,903,428.71   Completed
          Dingras           Potable Water Supply          4,500,000.00    4,500,000.00    3,600,000.00   On-going (37%)
          Marcos            Drainage system               1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Marcos            Potable Water Supply          2,500,000.00    2,500,000.00    2,000,000.00   Notice of Award
          Nueva Era         Footbridge                    2,500,000.00    2,500,000.00    2,000,000.00   On-going (5%)
          Nueva Era         Footbridge                    3,300,000.00    3,300,000.00    2,640,000.00   On-going (5%)
          Pagudpud          Footbridge                    500,000.00     500,000.00    500,000.00   Completed
          Pagudpud          Rescue equipment              734,650.00     734,650.00    661,185.00   Completed
          Pagudpud          Potable Water Supply          500,000.00     500,000.00    500,000.00   Completed
          Paoay             Flood control                 4,420,000.00    4,420,000.00    4,405,356.94   Completed
          Pasuquin          Potable Water Supply          1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Vintar            Potable Water Supply          1,000,000.00    1,000,000.00    1,000,000.00   Completed
                                                        Ilocos Sur
          Banayoyo          Potable Water Supply          1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Burgos            Drainage system               1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Burgos            Potable Water Supply          1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Burgos            Potable Water Supply          630,000.00     630,000.00    630,000.00   Completed
          Cabugao           Flood control                 628,500.00     628,500.00    628,500.00   Completed
          Caoayan           Potable Water Supply          3,676,500.00    3,676,500.00    2,941,200.00   Completed
          Cervantes         Potable Water Supply          1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Lidlidda          Potable Water Supply          3,000,000.00    3,000,000.00    2,400,000.00   Ad / Posting
          Magsingal         Footbridge                    3,000,000.00    3,000,000.00    2,996,863.50   Completed
          Nagbukel          Drainage system               800,000.00     800,000.00    800,000.00   Completed
          Nagbukel          Potable Water Supply          4,461,000.00    4,461,000.00    3,568,800.00   Completed
          Narvacan          Evacuation center             1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Narvacan          Flood control                 2,000,000.00    2,000,000.00    1,600,000.00   Completed
          Quirino           Flood control                 1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Quirino           Flood control                 1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Quirino           Flood control                 500,000.00     500,000.00    500,000.00   Completed
          Quirino           Flood control                 500,000.00     500,000.00    500,000.00   Completed
          Quirino           Flood control                 500,000.00     500,000.00    500,000.00   Completed
          Quirino           Flood control                 1,000,000.00    1,000,000.00    1,000,000.00   Completed
          Salcedo           Potable Water Supply          2,000,000.00    2,000,000.00    1,600,000.00   Completed
          San Emilio        Potable Water Supply          3,807,000.00    3,807,000.00    3,045,600.00   On-going (50%)
          San Esteban       Flood control                 4,700,000.00    4,700,000.00    4,696,935.58   Completed
          San Esteban       Potable Water Supply          1,680,000.00    1,680,000.00    1,344,000.00   Completed
          San Ildefonso     Drainage system               4,367,600.00    4,367,600.00    4,362,167.86   Completed
          San Juan          Flood control                 1,000,000.00    1,000,000.00    1,000,000.00   Completed
          San Vicente       Drainage system               1,100,000.00    1,100,000.00    1,097,441.93   Completed
          San Vicente       Flood control                 2,000,000.00    2,000,000.00    1,994,756.31   Completed
          Santa             Potable Water Supply          5,500,000.00    5,500,000.00    4,400,000.00   On-going (10%)
          Santa Catalina    Flood control                 12,500,000.00    12,500,000.00    12,454,504.35   Completed
          Santa Lucia       Flood control                 3,000,000.00    3,000,000.00    2,995,916.00   Completed