Page 27 - The DILG R1 in 2016
P. 27
CONTINUATION
CITY/ TOTAL
MUNICIPALITY PROJECT TITLE ALLOCATION OBLIGATION RELEASES STATUS
Mabini Potable Water Supply 12,500,000.00 12,500,000.00 10,000,000.00 Completed
Malasiqui Footbridge 1,500,000.00 1,500,000.00 1,200,000.00 Ad / Posting
Malasiqui Footbridge 2,000,000.00 2,000,000.00 1,600,000.00 Ad / Posting
Malasiqui Potable Water Supply 2,080,000.00 2,080,000.00 - MOA Signing
Manaoag Drainage system 1,750,000.00 1,750,000.00 1,400,000.00 Completed
Manaoag Drainage system 1,750,000.00 1,750,000.00 1,400,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Manaoag Drainage system 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Mapandan Drainage system 1,211,250.00 1,211,250.00 969,000.00 Completed
Mapandan Potable Water Supply 476,000.00 476,000.00 476,000.00 Completed
Natividad Potable Water Supply 1,000,000.00 1,000,000.00 1,000,000.00 On-going (80%)
Natividad Potable Water Supply 3,824,000.00 3,824,000.00 3,059,200.00 On-going (80%)
Pozorrubio Drainage system 500,000.00 500,000.00 500,000.00 Completed
Pozorrubio Potable Water Supply 2,500,000.00 2,500,000.00 2,497,997.68 Completed
Rosales Flood control 1,500,000.00 1,500,000.00 1,490,573.82 Completed
Rosales Evacuation center 3,500,000.00 3,500,000.00 3,490,405.50 Completed
San Fabian Rescue equipment 500,000.00 500,000.00 500,000.00 Completed
San Manuel Rescue equipment 1,000,000.00 1,000,000.00 999,000.00 Completed
San Nicolas Evacuation center 3,850,000.00 3,850,000.00 3,080,000.00 On-going (77%)
San Quintin Evacuation center 7,000,000.00 7,000,000.00 5,600,000.00 On-going (95%)
San Quintin Rescue equipment 3,000,000.00 3,000,000.00 2,700,000.00 Completed
San Quintin Flood control 2,500,000.00 2,500,000.00 2,000,000.00 Completed
Santa Maria Evacuation center 290,000.00 290,000.00 290,000.00 Completed
Santa Maria Flood control 1,000,000.00 1,000,000.00 1,000,000.00 Completed
Santa Maria Rescue equipment 750,000.00 750,000.00 675,000.00 Completed
Santo Tomas Public Market 67,803.69 67,803.69 67,803.69 Completed
Santo Tomas Public Market 2,932,196.31 2,932,196.31 2,770,772.71 Completed
Sison Potable Water Supply 8,230,000.00 8,230,000.00 6,584,000.00 On-going (82%)
Sual Drainage system 1,200,000.00 1,200,000.00 960,000.00 Completed
Sual Drainage system 3,100,000.00 3,100,000.00 2,480,000.00 Completed
Tayug Flood control 3,170,000.00 3,170,000.00 2,536,000.00 Completed
Urbiztondo Drainage system 1,500,000.00 1,500,000.00 1,494,695.20 Completed
Urbiztondo Evacuation center 2,500,000.00 2,500,000.00 2,491,127.00 Completed
Urdaneta City Drainage system 2,000,000.00 2,000,000.00 1,600,000.00 Completed
Villasis Flood control 1,000,000.00 1,000,000.00 1,000,000.00 On-going (45%)
Villasis Evacuation center 3,050,000.00 3,050,000.00 2,440,000.00 On-going (20%)
BuB 2016
CITY/ PROJECT TITLE ALLOCATION OBLIGATION TOTAL STATUS
MUNICIPALITY RELEASES
Ilocos Norte
Adams Potable Water Supply 2,045,000.00 2,045,000.00 2,045,000.00 Ad / Posting
Bangui Flood Control (Construction) 3,000,000.00 3,000,000.00 2,400,000.00 Ad / Posting
Bangui Potable Water Supply 3,000,000.00 3,000,000.00 3,000,000.00 Ad / Posting
Carasi Potable Water Supply 2,500,000.00 2,500,000.00 2,500,000.00 MOA Signing
Currimao Local Road Construction - Concrete Road 5,000,000.00 5,000,000.00 4,000,000.00 On-going (83%)
Dumalneg Local Road Construction - Sand and Gravel 5,000,000.00 5,000,000.00 4,000,000.00 On-going (80%)
Single Lane
Laoag City Rescue Equipment (Dumptruck) 3,000,000.00 3,000,000.00 2,400,000.00 On-going
22