Page 39 - 2_7_2015 DILG R1 Annual Report for web
P. 39
2014 BuB LAR Status of Projects 2015 Bottom-Up Budgeting
ive (5) DRR-related subprojects in
FBatac City, Ilocos Norte and San
Manuel, Labrador, Sta. Maria, and
Urbiztondo in Pangasinan and 16
Non-DRR subprojects in Cabugao,
Magsingal, San Esteban, San Ildefonso, San
Juan, San Vicente, and Santiago Ilocos Sur
and Basista, Calasiao, Manaoag, Rosales,
San Fabian and Urbiztondo, Pangasinan
are completed.
Php 175,177,366.02 BUB Other Local Infra
Funds were disbursed to the LGUs.
SANTIAGO, ILOCOS SUR
Three (3) LGUs are in the
process of constructing their water
supply systems under the 2015 Bottom-Up
Budgeting. These LGUs are Banayoyo,
Ilocos Sur; Santol, La Union; and
Aguilar, Pangasinan. Twenty-five (25)
other LGUs have entered into MOA
with the DILG R1 for the implementation
of water supply projects. These LGUs are
Badoc, Bangui, Banna, Batac City, Carasi,
Dingras, Marcos, Pagudpud, Pasuquin and
Vintar of Ilocos Norte; Caoayan, Cervantes,
Salcedo, San Emilio, San Esteban and
Suyo of Ilocos Sur; Caba and Pugo of
La Union; and Bautista, Burgos, Dasol,
Infanta, Mabini, Natividad and Sison of
Pangasinan. Php82,927,187.31 BUB Water STA. MARIA, PANGASINAN
Supply Funds have been disbursed to
LGUs.
BATAC CITY, ILOCOS NORTE
35